This industrial park features pre-engineered metal buildings with overhead doors, brick facade, metal awnings in front, 159 parking spaces.
Cameron Management is pleased to announce the groundbreaking of Sunnyvale Industrial Park. Located less than one mile from the NC Port of Wilmington, Sunnyvale Industrial Park will consist of four (4) pre-engineered metal buildings of 18,000 square feet each. Vertical construction on the first building will commence in June 2023. The buildings feature 22’ clear heights, three-phase power, an ESFR fire suppression system, and 12x12 garage doors spaced every 25’. Spaces will be delivered in cold dark shell condition with a concrete leave-out area for office upfit. There are no interior columns, enabling flexible sizing of each lease premises based on tenant requirements.